For issuance of permit for mining / transport of ordinary earth

Introduction

For mining permit, the online application should be submitted through the departmental portal with all required attachments such as applicant's name and address, mobile number, email ID, identification document, land record of the applied land, Khasra map showing the applied area, application fee, consent letter from the farmer, and other necessary documents.


After the online application submission, the DMO will review the ownership status of the applied land, public property security, and other aspects. After verification, the application will be either approved or rejected, and the relevant information will be displayed on the departmental portal.


If the application is approved, the mining permit will be issued online.


After the issuance of the permit, the procedure for transportation of ordinary soil (MM 10 generation) will be carried out through the departmental online portal.


The duration of the mining permit will be determined by the DMO.


If the quantity of ordinary soil mentioned in the permit is fully extracted, or if the permit duration expires, whichever occurs first, the permit will be considered automatically cancelled from that date.